Excellence in Structural Engineering

Industrial

Pomerleau Garage

Pomerleau Garage

Mandate to provide foundation plans for a heavy vehicle garage located at 705 1st Ave. in Sainte-Catherine, Quebec on cadastre including foundation design from loads and steel frame manufacturer plans. Plans will include foundations for a future 20 MT remote-controlled gantry crane supported on 30-foot spans as well as slab-on-grade design.

LH Schwindt (LHS) - Pipe Rack

LH Schwindt (LHS) - Pipe Rack

CWT was engaged by LH Schwindt (LHS) to obtain final approval and monitoring of rack fabrication and platform work required for the treatment process in Longueuil, Quebec. Modeling and integration of piping load, to comply with Quebec Building Code, was the central role played by CWT to meet these requirements.

Coldbox Storage

Coldbox Storage

Structural design regarding interior modifications (on behalf of Coldbox Storage), located at 10035-45 Henri-Bourassa in Saint-Laurent, Quebec. Review of existing building space, including: ceiling panel load on existing roof joists and additional HVAC/refrigeration unit load on existing roof joists. Structural preliminary drawings and as-built drawings were provided. Regular site visits during construction and completion of work.

JAM - 21000 TransCanada

JAM - 21000 TransCanada

Parking: Project management and design for permit acquisition regarding parking extension for JAM Industries, including lighting and landscaping. Roof: Review and repair of roofing as well as report and details to assist with legal claim. Mezzanine: Review and tender for new mezzanine.

Institutional & Heritage

St. Mark and St. Peter's Church

St. Mark and St. Peter's Church

1650 Decelles Street, St. Laurent, QC

CWT Consultants was mandated by St. Mark and St. Peter's Church to provide design documents for interior renovations. This included choir room repairs, entrance slab and sanctuary wall openings, and new stairs to the attic floor.

  • Code study and review
  • Structure modeling
  • Consultation with architect and staff
  • Design of repairs and reinforcement
  • Tender and construction plans
  • Bid evaluation and recommendations
  • Inspection and work directions to contractors
  • Inspection reports and conformity letter
Christ Victorious Church Facade

Christ Victorious Church Facade

Assessment and repair of damaged structure supporting the sanctuary roof in coordination with facade work by Varelas-Perilla Architects. Work was completed in several phases: Phase 1: feasibility study, non-destructive testing and inspections to prepare documents for repairs; selective demolition to plan scope of work and tender plans; Radex scans. Phase 2: design of reinforcement details and preparation of tender documents. Phase 3: Review of tender and contracting for third party testing. Phase 4: completion of final construction plans.

Centre Chrétien Métropolitain

Centre Chrétien Métropolitain

Stabilization of the Metropolitan Christian Center facade, a historic institutional building, including repair of architectural concrete panels, structural modifications, and partial demolition of the mezzanine.

Commercial

Tidan design center

Tidan design center

Montreal, QC

Major renovation project for the shopping center including structural assessment of existing conditions, design of new steel supports for facade modifications, and integration of new mechanical systems.

  • Structural assessment and documentation
  • Design of steel support systems
  • Integration of mechanical systems
  • Construction oversight
BANQUE NATIONALE DU CANADA
BEAUBIEN

BANQUE NATIONALE DU CANADA BEAUBIEN

Anjou, QC

Structural engineering services for the expansion of the shopping center, including new retail spaces and parking structure modifications.

  • Expansion design and planning
  • Parking structure modifications
  • Integration with existing structure
  • Construction phase services
BANQUE NATIONALE DU CANADA
papineauville

BANQUE NATIONALE DU CANADA papineauville

Côte-des-Neiges, Montreal, QC

Reinforcement and repairs for mezzanines at Côte-des-Neiges Metro station for the NBC Côte-des-Neiges branch.

National Bank of Canada - Côte-des-Neiges
Côte-des-Neiges, Montreal, QC

National Bank of Canada - Côte-des-Neiges Côte-des-Neiges, Montreal, QC

Inspection and modification of the roof terrace structure to ensure adequate support for live and dead loads.

Residential & Multi-Residential

10440 L'Esplanade Expansion, Ahuntsic, QC

10440 L'Esplanade Expansion, Ahuntsic, QC

Expansion of an existing semi-detached family home. The new volume includes a basement playroom, ground floor living room, and primary bedroom on the upper floor. The expansion's large openings allow optimal light entry while protecting from extreme summer temperatures in the new living spaces overlooking the backyard.

Thimens - Facade and Indoor Parking

Thimens - Facade and Indoor Parking

Assessment, concept development, and permit plans for the expansion and renovation of a residential property at 243 Portland Street. Preliminary studies and analyses, estimates, permits, and tender plans provided to the client.

Château Isabella
1030 Rue Melatti, Montreal, Quebec

Château Isabella 1030 Rue Melatti, Montreal, Quebec

Facade inspection and recommendations for maintaining safety and stability. Five-year inspection of a complex 10-story condominium with penthouses. Feedback on underground parking condition and recommendations for future work.

243 Portland Street

243 Portland Street

1030 Rue Melatti, Montreal, Quebec

On-site evaluation and proposal of options to address issues related to floor settlement near the garage entrance and necessary foundation wall repairs.

Recreational & Tourism

Hillside Tennis Club

Hillside Tennis Club

Outdoor wooden pergola with mechanized canopies and new terrace with foundations for the Hillside Tennis Club: drawings, supplier coordination, demolition drawings, site plan, and tender drawings provided. Coordination meetings to finalize plans and details as well as construction plans to complete the project.

Chisasibi Arena (Ongoing Project)

Chisasibi Arena (Ongoing Project)

Study for the addition of a new mezzanine and reconfiguration of entrance areas for increased hosting capacity.

Hotel Mont-Gabriel (Complete Foundations, Steel Work in Progress)

Hotel Mont-Gabriel (Complete Foundations, Steel Work in Progress)

Phase 1: Repair and reconstruction of the event pavilion and kitchen at Hotel Mont Gabriel following a fire. Affected areas included the central ballroom and kitchen roof, which also required modification of structural steel floor support beams. Phase 2: Coordination and design of a new pavilion and second phase of work including underpinning and new basement wall foundations along the service corridor adjacent to the new pavilion. New construction and 50-foot span extension of multipurpose rooms, including Revit modeling and feasibility work.